PennDOT has announced a long-term closure of the Ambridge / Aliquippa Bridge will begin on Saturday, March 3 — The bridge will remain closed through mid-November 2012. The $16.6 million project to rehabilitate the bridge includes deck and sidewalk replacement, concrete repair, steel repair and replacement, railing, structural steel painting, pavement patching and other improvements….